6.1.2 Commissioning ZENNER IoT Gateway IDUv2

The ZENNER IoT Gateway Indoor (IDUv2) starts immediately after being plugged in/connected. During the boot process, the gateway goes through several phases, which are indicated by the LEDs. Observe the following sequence:

 

Sequence of operations

LED 1

LED 2

LED 3

LED 4

Explanation

Boot process

1.

Off

Off

Off

Off

No power supply

2.

Red

Red

Off

Off

Initialization of the hardware

3.

Green

Off

Red

Red

Initialization of the hardware

4.

Green

Off

Red

Red

Mobile connection not active

No connection to the LNS

5.

Green

Off

Off

Red

Mobile connection active

No connection to the LNS

Ready for operation with mobile phone connection

6.a)

Green

Off

Off

Green

Normal status

Ready for operation with network connection

6.b)

Green

Green/

Orange

Red

Green

Normal status

Ready for operation with network and mobile phone connection

6.c)

Green

Green/

Orange

Off

Green

Normal status

Update via mobile connection

 

Flashes Red/Green

Off

Off

Green

The power LED flashes to signal the update process

Update via Ethernet network connection

 

Flashes Red/Green

Green/

Orange

Red

Green

The power LED flashes to signal the update process

Provider change

 

Flashes Red/Green

Off

Red

Red

Modem attempts to dial into another mobile network

Error cases (gateway must be replaced)

 

Off

Off

Off

Off

If plugged in: Power supply or hardware defect

 

Red >10 Minutes

Off

Off

Off

Hardware error

 

Off

Off

Red

Off

Hardware error

 

Off

Off

Red

Red

Hardware error

 

Off

Off

Off

Red

Hardware error

 

Off

Off

Off

Green

Hardware error